Chennai: Motorists negotiating the Kattupakkam junction could finally get relief from traffic snarls, as Chennai Metro Rail Ltd (CMRL) plans to build an integrated grade separator with a rotary at the busy intersection where three major roads meet. Metrorail will be constructing the flyover at a cost of Rs 152.03crore for the State Highways Department and has invited bids.A metrorail official said the structure will come up at the intersection of Mount–Poonamallee–Avadi Road, Chennai–Chittoor–Bangalore Road and Poonamallee–Kundrathur–Pallavaram Road.The flyover will be aligned beneath the elevated Metro viaduct, covering the Kumananchavadi and Karayanchavadi Metro stations. It will not be located at Kattupakkam Metro station,” the official said.CMRL has designed the metro piers to carry the combined load of the viaduct and the proposed flyover, incorporating the necessary provisions during construction, the official said. The tender includes the grade separator, rotary, drainage and associated works, with a construction period of 456 days.The project has been pending since 2022, when the state budget announced a grade separator with an elevated rotary at Kattupakkam at an estimated cost of Rs322 crore. The latest tender puts the project value at Rs152.03 crore.A CMRL official said the difference in the two estimates could be due to changes in the length of the proposed structure, the materials to be used or the overall scope of work. The earlier estimate may also have included land acquisition costs, the official said.Residents say the junction where three major roads intersect urgently needs a solution as it is a bottleneck. P Senthil Kumar, a Porur resident, said the carriageway towards Poonamallee was much wider than the one towards Porur, which carries heavier traffic, particularly between Kumananchavadi and Kattupakkam Metro station, near the point where Poonamallee High Road branches off.“Faulty traffic signals and lack of proper traffic monitoring often lead to congestion. Motorists take at least 15 to 20 minutes to cross a stretch of barely 200 metres. A grade separator may ease the congestion,” he said.